Multiple Bridge Deck Chip Seal Projects Scheduled to Begin in Rapid City Area
For Immediate Release:
Tuesday, Aug. 25, 2026
Contact:
Jeff Gillam, Project Engineer, 605-381-7408
RAPID CITY, S.D. – Beginning Monday, Aug. 31, 2026, crews will begin a bridge deck chip seal project at three different locations in the Rapid City area. The bridge deck chip seal projects are planned for the following routes:
East S.D. Highway 44 in Farmingdale;
U.S. Highway 16B in Rapid City over the railroad; and
S.D. Highway 44 (Omaha Street) near Waterloo Street.
The project will consist of repairing concrete and placing a polymer chip seal on the bridges. All operations are weather dependent.
Traffic Impacts:
During the project, traffic on Highway 44 will be controlled with the use of stop signs in each direction with a single lane of travel.
Traffic on Highway 16B and Omaha Street will be reduced to one lane and guided with the use of flaggers.
Motorists should be prepared for suddenly slowed or stopped traffic and be alert of workers and equipment adjacent to the roadway.
The prime contractor on the $290,000 project is Louis Company, LLC. of Grain Valley, MO. The overall completion date is Friday, Oct. 16, 2026.
About SDDOT:
The mission of the South Dakota Department of Transportation is to provide a safe and efficient public transportation system.
For the latest on road and weather conditions, road closures, construction work zones, commercial vehicle restrictions, and traffic incidents, please visit https://sd511.org or dial 511.
Read more about the innovative work of the SDDOT at https://dot.sd.gov
-30-
Legal Disclaimer:
EIN Presswire provides this news content "as is" without warranty of any kind. We do not accept any responsibility or liability for the accuracy, content, images, videos, licenses, completeness, legality, or reliability of the information contained in this article. If you have any complaints or copyright issues related to this article, kindly contact the author above.