Walton County Projects in Progress Report

Walton County Projects in Progress

 

Walton County, FL – 09/21/26 – Walton County Public Works is pleased to share the latest updates regarding ongoing infrastructure projects designed to improve community infrastructure. All activities are weather dependent and may be delayed or rescheduled in the event of inclement weather. Drivers are reminded to use caution when traveling through a work zone and to watch for construction workers and equipment entering and exiting the roadway.


E. PRIMROSE AVENUE DIRT TO PAVE

Project Improvements:

• Paving 0.35 miles extending from Walden Road to Clearwater 

Drive

• Pavement striping

• Sod installation

Current Status:

• Construction (stabilizing road base) 

Traffic Impacts:

Intermittent shoulder and lane closures are anticipated throughout the duration of the project.

 

ORANGE BLOSSOM AVENUE (EAST AND WEST) DIRT TO PAVE

Project Improvements:

• Paving 0.26 miles extending from Brookside Drive to the end of maintenance

• Pavement striping

Current Status:

• Construction (stabilizing road base)

• Drainage completed

• Sod installation completed

Traffic Impacts:

Intermittent shoulder and lane closures are anticipated throughout the duration of the project.


POINSETTA AVENUE (EAST AND WEST) DIRT TO PAVE

Project Improvements:

• Paving 0.32 miles extending from Walden Road to the end of maintenance

• Pavement striping

• Sod installation

Current Status:

• Construction (stabilizing road base) 

• Drainage Improvements-drainage inlets installed

• Installation of sod

Traffic Impacts:

Intermittent shoulder and lane closures are anticipated throughout the duration of the project.


13th STREET DIRT-TO-PAVE AND DRAINAGE IMPROVEMENTS

Project Improvements:

• Paving 0.64 miles extending from Churchill Bayou Road to the end of maintenance

• Pavement Striping

Current Status: 

• Under Construction (stabilization) 

• Drainage Improvements ongoing

Traffic Impacts: Intermittent shoulder and lane closures are anticipated 

throughout the duration of the project.


SOUTHBOUND RIGHT TURN LANE ON OLD FERRY ROAD

Project Improvements:

• Construction of a southbound right turn lane at the intersection of Old Ferry Road and US 98. 

Current Status: 

• Construction

Traffic Impacts: Intermittent shoulder and lane closures are anticipated 

throughout the duration of the project


FOUR MILE ROAD OVERLAY

Project Improvements:

• The overlay operation will commence on Four Mile Road extending from the intersection of E. Bay Loop to SR 20 for approximately 1.12 miles.

Current Status: 

• Construction (asphalt overlay) Completed

• Striping

Traffic Impacts: Intermittent shoulder and lane closures are anticipated 

throughout the duration of the project


ADDITIONAL PROJECTS

• Lake Drive - Working on the multi-use path, repairing culvert headwalls and ditch maintenance

• W Harborview Road -Construction of a new sidewalk 

• Paxton Senior Center - Asphalt paving parking lot and striping

• Harbor Trace - Drainage maintenance




                                                                                                           # # # # # 

Legal Disclaimer:

EIN Presswire provides this news content "as is" without warranty of any kind. We do not accept any responsibility or liability for the accuracy, content, images, videos, licenses, completeness, legality, or reliability of the information contained in this article. If you have any complaints or copyright issues related to this article, kindly contact the author above.